Project for manufacturing Sorbitol was conceived and planning was started
1986
Sorbitol manufacturing starts at Badnawar plant with production capacity of 10 Metric tons per day
1991
Indigenous High Pressure Autoclave chamber was designed and commissioned at Badnawar Plant
1994
Badnawar Plant was integrated for Corn Grinding & Captive H2 Generation plant was commissioned
1995
Major Expansion was done at the Badnawar plant to increase the production capacity by 5 times that is 50 Metric Tons per day
1996
Captive Power generation unit was installed for the Badnawar Plant. Biogas generation was also started from the Waste material to reduce Pollution and Fossil fuels.
1991
Indigenous High Pressure Autoclave chamber was designed and commissioned at Badnawar Plant
2000
Badnawar Plant Production capacity was increased to 100 Metric Tons per day
2001
Green field Project Setup started at Vapi Gujarat
2002
Commencement of Production at Vapi Plant with capacity of 40 Metric Tons per day
(IMP: Worlds first plant in this industry using maximum gravitation flow for liquid movement which helped in 40% reduction in power consumption)
2005
Vapi Plant production capacity increased to 60 metric tons per day
2006
Liquid Glucose production started at Badnawar Plant
2007
Both the Plants upgraded to meet the Global standard and started exporting the production in the International market
2011
Waste water RO plant commissioned at Badnawar to conserve 80% water
2013
Certified and recognized as STAR Export house from DGFT (Director General of Foreign Trade)
2014
New Products like HFCS Syrup introduced in the Indian Market
2015
Badnawar Plant capacity increased to 200 metric tons per day making Kasyap Sweeteners daily production capacity to 300 metric tons per day which is the largest in ASIA.